120 Braley Rd. P.O. Box 429 East Freetown, MA 02717-0429 www.htproduc
10 LP-83 Rev. 3.24.14 NOTE: If you do not provide the mini
11 LP-83 Rev. 3.24.14 dissolved solids in excess of 2,000
12 LP-83 Rev. 3.24.14 Use both thread tape and pipe dope t
13 LP-83 Rev. 3.24.14 This water heater can deliver scaldi
14 LP-83 Rev. 3.24.14 H. PIPING NOTES: 1. Minimum pipe s
15 LP-83 Rev. 3.24.14 NOTES: 1. Minimum pipe size shou
16 LP-83 Rev. 3.24.14 Figure 6 – Zoning with Zone Valves
17 LP-83 Rev. 3.24.14 Figure 7 – Zoning with Circulators
18 LP-83 Rev. 3.24.14 Figure 8 – Typical Installation wit
19 LP-83 Rev. 3.24.14 Figure 9 – Typical Installation wit
2 LP-83 Rev. 3.24.14 The following defined terms are use
20 LP-83 Rev. 3.24.14 Figure 10 – Typical Dual Purpose Ap
21 LP-83 Rev. 3.24.14 Figure 12 – Dual Purpose Applicatio
22 LP-83 Rev. 3.24.14 Figure 14 – Typical Steam Boiler -
23 LP-83 Rev. 3.24.14 Figure 16 – Typical Multiple Tank I
24 LP-83 Rev. 3.24.14 When wiring the water heater and c
25 LP-83 Rev. 3.24.14 ZONING WITH CIRCULATORS – 4845 RELAY
26 LP-83 Rev. 3.24.14 ZONING WITH CIRCULATORS USING L8124
27 LP-83 Rev. 3.24.14 ZONING WITH CIRCULATORS – R182D AND
28 LP-83 Rev. 3.24.14 ZONING WITH CIRCULATORS USING L8124
29 LP-83 Rev. 3.24.14 USING L8148A OR L8152A COLD START BO
3 LP-83 Rev. 3.24.14 PART 3 – HEATER PIPING ...
30 LP-83 Rev. 3.24.14 USING L8148A OR L8152A COLD START BO
31 LP-83 Rev. 3.24.14 PART 5 – START-UP AND OPERATION 1. F
32 LP-83 Rev. 3.24.14 Figure 31 –Parts MODEL #1 – T&P
33 LP-83 Rev. 3.24.14 PART 6 – MAINTENANCE AND TROUBLESHOO
34 LP-83 Rev. 3.24.14 TROUBLESHOOTING NO HOT WATER PROBL
35 LP-83 Rev. 3.24.14 HTP CUSTOMER INSTALLATION RECORD FO
4 LP-83 Rev. 3.24.14 NOTE: OBTAIN ALL APPLICABLE PERMITS A
5 LP-83 Rev. 3.24.14 PRODUCTS TO AVOID AREAS LIKELY TO HAV
6 LP-83 Rev. 3.24.14 Figure 1 – Dimensions
7 LP-83 Rev. 3.24.14 Figure 2 - Specifications CONTINUOUS
8 LP-83 Rev. 3.24.14 A. REDUCED BOILER INPUT SIZING GUIDE
9 LP-83 Rev. 3.24.14 B. PERFORMANCE AND SIZING GUIDELINES
Comments to this Manuals